16th July 2014
P&M Packing was recently asked to consult on the transportation of a foil for a hydrofoil from Dover to Australia. The foil was 4.5 metres long by 6.5 metres wide, and, after analysis, it was decided to manufacture a special base to ensure its stability in transit.
P&M Packing designed and built the base – without which the journey would have been impossible – and packed the foil onto the base on the customer’s site, allowing the whole to be moved by crane onto a lorry for the first part of its journey.
Click the button for a confidential and no-obligation quotation
Simply fill out the form below for a confidential and no-obligation quotation
Simply fill out the form below for a confidential and no-obligation quotation