Background: Our client needed an entire automotive production line to be packed for shipping from the UK to Mexico. This had to be done in the Christmas window – packing on 27th December with the vessel sailing on the 30th. Another constraint was the limited space available in which to work.
Solution: The P&M Packing team surveyed the site, planned the project, organised the container load plans and pre-built the cases. On the day, careful manoeuvring was necessary to allow each part to be removed, packed and then replaced in turn. The machinery filled 31 cases and subsequently four 40-foot containers. Each part was foil barrier and desiccant protected, and the whole shipment was ISPM15 compliant for export. We are glad to say that the project was completed on budget and on schedule – with an hour to spare!